Repair guide · IGBT / power stage · 5 min
IGBTs are the power switches in VFDs, servo drives, UPS and induction heaters. When they fail they usually short, which trips the drive or blows the input fuses. A digital multimeter's diode test is enough for a first check.
â ïž Safety first: these checks are for trained electricians and maintenance engineers. Work only on isolated equipment, use a meter rated CAT III, and never open a powered unit. If in doubt, send photos to us instead.
You need: Digital multimeter with diode test · Insulated screwdriver to discharge the gate (optional: 10 kΩ resistor)
Switch off and isolate the supply, then wait at least 10 minutes and measure the DC bus (P/+ and N/â) with a multimeter on the DC 1000 V range before touching anything. Drive and SMPS capacitors can hold a lethal charge long after the display goes off.
Briefly short gate and emitter of the IGBT (or keep the gate driver connected) so the IGBT is not partly switched on by a stored gate charge, which would give false readings.
Red probe on emitter, black on collector: you should read a diode drop of about 0.3â0.7 V. Reversed probes (red on collector): the meter should show open (OL).
A reading close to 0 V or a beep in both directions means the IGBT is shorted. In a 3-phase module, test each of the six switches (P to U/V/W and U/V/W to N).
A multimeter only finds shorted switches and open diodes. Its test voltage is usually too low to switch an IGBT on (gate threshold is about 5â6 V), so an IGBT can pass the meter test and still fail under load. A proper check uses an IGBT tester or a gate-drive and load test.